
LIPS is a process & construction plan that:
- dramatically reduces the width of ROW required to install small inch pipelines
- minimizes the loss of forested lands
- significantly reduces or eliminates the liability for both short and long-term land degradation
- reduces the lost crop production generated by outdated construction practices
- permits the maximization of future crop production
THE GOAL: to achieve an environmental outcome that will leave the land in the same state as it was prior to installation.
What we do:
L.I.P.S. is a full-service small-inch pipeline project specialist that provides Vision, Leadership, Know-How & all Tools and Equipment. Our goal is to provide cost-effective pipeline services with zero residual impact on the environment.
What we can do for you:
- L.I.P.S. systems training.
- Provide soils and vegetation management plans.
- Provide specialized construction tools to industry.
- Inspection services.
- Environmental assessment.
- Risk management assessment.
